Welcome to Shandong Hihsteel Co. Ltd.

Project Case

Doha Prefab Site Office Camp

Doha Prefab Site Office Camp
LocationDoha, Qatar Products UsedModular House/EPS Sandwich Panel/Light Steel Frame Area / QuantityPrefab rooms: 310; EPS panels: 13,200 sqm Project Time2018-12-11

A site office and accommodation camp assembled with modular house units and EPS insulated panels.

  • Location: Doha, Qatar
  • Product: Modular House, EPS Sandwich Panel, Light Steel Frame
  • Area: Prefab rooms: 310; EPS panels: 13,200 sqm
  • Time: 2018-12-11
  • Region: Middle East

Project Engineering Scope & Material Configuration

This project in Doha, Qatar (supply scope: Prefab rooms: 310; EPS panels: 13,200 sqm, project year: 2018-12-11) was engineered and supplied by SHANDONG HIHSTEEL CO., LTD. The building envelope and structural package incorporate Modular House/EPS Sandwich Panel/Light Steel Frame, tailored to local wind load, thermal insulation, acoustic and fire-safety requirements.

Pre-Shipment Quality Inspection & Containerized Export Delivery

  • Custom Engineering & Detailing: All panel lengths, joint profiles, structural connections and flashing trims were pre-calculated from the project layout drawings to minimize on-site cutting and accelerate installation in Doha, Qatar.
  • Traceable Factory Quality Control: Substrate thickness, coating weight, core density and interlocking tongue-and-groove tolerances were verified under our Quality Control System prior to packing.
  • Seaworthy Export Packing: Components were bundled with protective surface film, edge guards and piece-mark labels for 40HQ container transport under our Export Packaging & Delivery Standards.
WhatsApp