Multi Storey Steel Buildings / Product / Steel Structure Systems
Product Detail
Product attributes ① Building type: Po
Product attributes
① Building type:
Portal frame construction
② Type of main steel structure:
There are many welded H-shaped and box shaped components used in the main steel structure of such buildings, as well as other types of components such as cross shaped and circular hollow section components.
③ Secondary steel structure:
Column support, horizontal support, tie bar, stairs, guardrail, etc.
④ Cladding system:
Type C /Z purlin, round steel, bracket, casing
The roof and wall are often made of pressed color steel plate, ACC prefabricated wall panel, polyurethane edge rock wool sandwich board.
⑤ Galvanized standard, paint type and color:
Customize according to actual architectural application requirements and your specific requirements.
Prefabricated construction portal frame warehouse is custom-engineered by SHANDONG HIHSTEEL CO., LTD for industrial storage, manufacturing workshops and logistics hubs across 80+ countries and regions. Each frame is designed to local wind load, snow load and seismic requirements using Q355B / ASTM A572 Gr.50 steel.
| Component | Material & Standard | Specification & Surface Treatment |
|---|---|---|
| Primary Columns & Rafters | Q355B / ASTM A572 Gr.50 Welded H-Steel | CNC-drilled, Sa2.5 shot-blasted, epoxy zinc-rich primer or hot-dip galvanized |
| Secondary Framing (Purlins & Girts) | Q235B / S350GD Cold-Formed C/Z Sections | Hot-dip galvanized Z180–Z275 g/m², pre-punched for fast bolted assembly |
| Roof & Wall Cladding | Corrugated Steel Sheet or Sandwich Panel | 50–200 mm EPS, Rock Wool (EN 13501-1 Class A) or PU/PIR insulated panels |
| Connections | Grade 10.9 High-Strength Structural Bolts | 100% bolted on-site erection with 3D Tekla drawings and piece marks |
Please share the building length × width × eave height, local wind speed, snow load, seismic zone, overhead crane capacity (if any) and wall/roof cladding preference. HIHSTEEL engineers prepare structural calculations and preliminary layout drawings for quotation.
Primary welded H-section columns and rafters are fabricated from Q355B / ASTM A572 Gr.50 high-strength steel with Sa2.5 shot-blasting and epoxy zinc-rich primer or hot-dip galvanizing, paired with galvanized C/Z purlins and Grade 10.9 high-strength bolts.
All steel members are CNC-drilled, weld-inspected and stamped with steel-plate piece marks matching the 3D Tekla erection drawings. Components are bundled for 40HQ container loading so on-site erection uses 100% bolted connections without field welding.
Engineering drawing confirmation takes 3–7 days, and factory fabrication of primary steel frames plus insulated roof/wall sandwich panels typically takes 20–35 days depending on total tonnage and building complexity.