1:Descriptions for Prefabricated Steel Structure Buildings
Main Structure | Frame Structure/Beam and Column Structure/Space Grid Structure/Truss Structure |
Purlin | C Section or Z section,Q235B,Q345B |
Cladding system | Sandwich panels for wall and roofing,single sheets for wall and roofing |
Roof/Wall Caldding | Corrugated Plate,or Sanwich panels for fireproof,insulation requirements,can choose EPS,PU/PIR,Rock Wool sandwich panels. |
Brace | Q235B/Q345B Round Steel Tube/Angel steel/steel pipe |
Tie Bar | Q235B/Q355B Round Steel Tube |
Roof gutter | Galvanized color sheets or SS steel |
Parapet | Designed as the customers' requirements. |
Rain Spout | PVC pipes |
Covering/Flashing | Bending parts from the galvanized color sheets to cover the edges. |
Windows | Glass curtain,normal windows,Plastic windows,Aluminum Alloy windows,double glazed windows,fixed windows,opened windows,as your requirements |
Skylight | PVC Skylight Panels |
Ventilation | Ventilators, louvers |
Doors | KFC doors,Glass doors,Swing door,Fire Exit doors,sandwich sliding doors,rolling doors,Electric rolling doors. |
Connectiong | High strength Bolts,Normal Bolts,Anchor bolt |
Packings | Suitable for shipping packaging,pallets, 40HQ, 40GP, according to your requirements. |
Accessories | All screws,sealant,glue |
The process of steel structure members involves several key steps to ensure the fabrication of high-quality components. It begins with detailed engineering drawings and design calculations to determine the exact specifications. Next, the raw materials, usually steel plates or sections, are cut to size using various cutting techniques such as shearing or plasma cutting. After cutting, the edges are prepared for welding, and the members are assembled into the required shapes and sizes. Welding is a critical process to join the pieces securely. Once the welding is completed, the members undergo surface treatment, such as sandblasting and painting, to protect them from corrosion. Finally, the finished steel structure members are inspected for quality before being delivered to the construction site.
3:Loading of Steel Structure Members
The loading of steel structure members is a crucial process in their transportation and installation. It involves carefully arranging and securing the components onto trucks or trailers to ensure safe transportation to the construction site. During loading, proper lifting equipment and techniques are employed to prevent damage to the members and ensure their stability during transit. Additionally, the weight distribution and balance of the load are carefully considered to prevent any tilting or shifting during transportation. At the construction site, the unloaded members are handled with care and lifted into position using cranes or other lifting equipment, following strict safety protocols.
4:Our Certifications and Honors of Steel Buildings
5:Multi-Story Steel Structure Hotel Buildings Project Cases
We have successfully completed numerous project cases of multi-story steel structure hotel buildings. Our expertise in steel construction combined with our commitment to delivering high-quality and aesthetically pleasing designs has resulted in exceptional hotel structures that meet the unique needs of our clients. From luxurious resorts to modern boutique hotels, our team of experienced professionals ensures meticulous planning, efficient execution, and timely completion of every project. The use of steel as the primary construction material allows for versatility, durability, and cost-effectiveness, making our hotel buildings a preferred choice for developers and investors. Experience the excellence and sophistication of our multi-story steel structure hotel buildings.